Purpose Of Use | Social Housing |
Building Model | Prefabricated Building |
Number Of Buildings | 3 Units |
Total Area | 248 m2 |
Project Year | 2021 |
Region To Be Used | Tashkent - Uzbekistan |
Completion Time | 17 Days |
Our houses continue to be in demand from different countries due to their technological advantages such as fast production and quick on-site installation, in addition to meeting housing expectations. Our new generation designed houses were chosen for the social housing project in Uzbekistan. Our energy-efficient prefab houses with high insulation will be safely used in Uzbekistan, where the climate is characterized by extremely hot summers and harsh winters.
As part of the social housing project, the initial installations of the houses, which were produced in three different models, have been completed and delivered. The prepared houses were delivered to the affected families in a ceremony attended by the President of Uzbekistan, Shavkat Mirziyoyev, following the devastating flood that rendered their homes uninhabitable in the capital city of Tashkent last year.
The houses, designed and produced in three different single-story plans, are delivered to the affected families considering their household size. Within the project scope, our 97 square meter Şirince model with a 3+1 floor plan, our 123 square meter Kardelen model with a 3+1 floor plan, and our 1+0 floor plan Hobi prefab house model for elderly and single individuals were produced and installed in the country. Our houses, manufactured using bolt-nut connection system with the use of welding-free technology, can be transported to overseas countries according to international shipping standards. The installation of our houses is carried out on-site by a three-person team and depending on the size of the house, it takes an average of 3 to 7 days for them to be assembled and ready for use.
Our houses, produced with state-of-the-art technology for long-term use and earthquake resistance, have become the preferred choice for social housing projects due to their modern production line system for fast and efficient production, easy transportation with the disassembly package system, quick on-site installation, and highly economical prices. With our fast production and installation capabilities, we provide the quickest housing solution to areas where there is a need for housing after floods or other disasters and where there is a shortage of social housing. The affordability of our ready-made houses is mainly achieved through the combination of ensuring building safety, mass production of numerous modern designs using advanced technology, and minimizing material waste during the manufacturing process. With our annual production capacity of thousands of houses, Karmod continues to carry out numerous social housing projects.
In standard social housing projects, one of the most important considerations is to complete the construction of houses in a short period of time while ensuring their safety. Prefabricated houses offer significant advantages in closing the housing gap with their long-lasting building safety and quick installation. Karmod prefabricated houses are manufactured using a pre-production system in modern facilities. Once the production is completed, the houses can be shipped to any part of the world with ease due to convenient logistics capabilities. By utilizing the prefabricated building model, thousands of houses can be produced within days and installed on-site in a short time.
From one end of the world to the other, we enable our customers to reach the ready-made construction sector produced with the new technology of the world. We guarantee reliability through technology and innovation, flexible commercial models and smart supply chain solutions that add value for you, following the project production network.