You can reach us from our sales offices and call center for all your requests.

Akkuyu Nuclear Power Plant Construction Site Structures, Mersin – Turkey

Purpose Of Use Turkey's first Nuclear Power Plant Workers' Camp
Building Model New Generation Container
Number Of Buildings 4 Blocks (3 Floors Each)
Total Area 4 Blocks 12,072 m2 (2.016 + 3.264 + 3.396 + 3.396)
Project Year 2019 and 2020
Region To Be Used Mersin, Turkey
Completion Time 105 days
Currently 61 guests are viewing this project

We established labor camp structures of Turkey's first nuclear power plant Akkuyu.

We have completed construction site mobilization buildings at the Akkuyu Nuclear Power Plant, which will be the first nuclear power plant of Turkey, and is under construction in Akkuyu, Gülnar district of Mersin. We had the opportunity to show our success in building site campus buildings for important projects that stand out in the world's largest companies in another important project such as Mersin Akkuyu nuclear power plant.

The prefabricated building system is a building model that does not have an alternative with its advantages in meeting the construction site needs of important projects that race against time such as energy, airport and road construction. Because the prefabricated buildings offer the opportunity to install in very short periods with features of pre-demounted pre-production systems, easy shipment and bolted union and solderless on the field. Thus, with the building model, the site campuses where thousands of technical personnel and workers will be accommodated, such as the Akkuyu nuclear project, can be quickly set up and ready for use within the time period expressed in the days.

Karmod is one of the leading brands that come to mind in the production and installation of prefabricated construction site buildings with its safe construction solutions spread to 120 countries since 1986. Another important task in meeting the needs of the container construction site buildings of the Nuclear Power Plant Project that has an important function which will be a first for Turkey and when completed, it will meet 6% of the country's energy needs with its 4800 MWe energy power was undertaken by Karmod. As Karmod, we are proud of taking part in this important project which will be built by the Russian public company Atomstroyexport (sub-company of Atomenergoprom affiliated with ROSATOM) with the build-operate-transfer model and will be carried out according to the interstate agreement between Russia and the Government of the Republic of Turkey, with our construction site mobilization building structures.

This huge project, consisting of 4 blocks of three floors each, with a total size of 9954 square meters and which can accommodate 3264 people at the same time, was put into service as ready to use in a record time of just 105 days. Container dormitory and dining hall buildings that provide safe use opportunity at international worker safety standards was carefully prepared with Karmod expertise for the project using the new generation container model developed in Karmod R&D. Undoubtedly, in the completion of the project in such a short time, it is necessary to emphasize the importance of Karmod's organizational success. Undoubtedly, in the completion of the project in such a short time, it is necessary to emphasize the importance of Karmod's organizational success. In the modern facilities in Tuzla Orhanlı, while the production was continuing, the units disassembled with the logistics organization were safely shipped to the project site. Karmod assembly teams present in the field with the first shipment, progressed the installation of the blocks with precision craftsmanship and sequentially. Prefabricated worker wards were lined up in a planned way and tied to the main corridor, which extended almost like a rope. For the well-being of the workers in the ward rooms, air conditioning and ventilation works were carried out diligently. Prefabricated toilets (WC) bathroom units planned according to the number of workers to stay on each floor were completed with precision, ready for use, taking into account the ergonomics of use.

At this stage, it is useful to mention the units used in the blocks located in the Akkuyu Nuclear project construction site mobilization building structures. In the whole project, 3x7 Karmod new generation container units were used. In the first block, a total of 126 container units were used. 108 of the units used in this block will be used as dormitories. Again, in this block, 9 showers and 9 wc units, each of which has 7 separate cabins, were placed on floors. In the second block, 84 container units, that 72 of them are dormitories, 6 of them are showers and 6 of them are wc, were prepared.

In the third block, a total of 138 container units were used. 120 units of them took place as dormitories, and 9 wc shower containers. The 4th block in the project has the same size as the first block and has 126 container units in total.

 

As Karmod, in our construction camp buildings that we produce and install ready for use, there are structures such as a prefabricated dormitory building that has international worker health and safety standards, executive prefabricated office buildings, multi-purpose prefabricated offices, ergonomic prefabricated offices special for the use of technical personnel, prefabricated office offering multi-purpose use, prefabricated construction site dining hall under food safety conditions. In engineers and workers' dormitories, building site bunk beds are provided by Karmod as an option considering the ergonomics of use.

At this stage, it is useful to mention the units used in the blocks located in the Akkuyu Nuclear project construction site mobilization building structures. In the whole project, 3x7 Karmod new generation container units were used. In the first block, a total of 126 container units were used. 108 of the units used in this block will be used as dormitories. Again, in this block, 9 showers and 9 wc units, each of which has 7 separate cabins, were placed on floors. In the second block, 84 container units, that 72 of them are dormitories, 6 of them are showers and 6 of them are wc, were prepared.

In the third block, a total of 138 container units were used. 120 units of them took place as dormitories, and 9 wc shower containers. The 4th block in the project has the same size as the first block and has 126 container units in total.

As Karmod, in our construction camp buildings that we produce and install ready for use, there are structures such as a prefabricated dormitory building that has international worker health and safety standards, executive prefabricated office buildings, multi-purpose prefabricated offices, ergonomic prefabricated offices special for the use of technical personnel, prefabricated office offering multi-purpose use, prefabricated construction site dining hall under food safety conditions. In engineers and workers' dormitories, building site bunk beds are provided by Karmod as an option considering the ergonomics of use.

Our Projects

This is our job

From one end of the world to the other, we enable our customers to reach the ready-made construction sector produced with the new technology of the world. We guarantee reliability through technology and innovation, flexible commercial models and smart supply chain solutions that add value for you, following the project production network.

Discover

Our Major Projects