Prefabricated Site Facilities for a Road Construction Project

Purpose Of Use Construction Site Structures
Building Model Prefabricated Structures
Number Of Buildings 3 Block
Total Area 579 m²
Project Year 2026
Region To Be Used Antalya / Turkey
Completion Time 20 Days
Currently 78 guests are viewing this project

Prefabricated Site Facilities for the Elmalı–Finike Road Project

Karmod continues to be a preferred supplier of site buildings for highway projects. In Antalya, we completed another site setup project. The buildings we installed are already in use on the new road project that will link Elmalı and Finike via the Lake Avlan area.

Expertise in Providing Comfortable Facilities for Site Workers

Our expertise in site buildings adds value to each project. Short manufacturing and installation times help projects stay on schedule when deadlines are tight. Our planning specialists also help investors choose the right solution.

To get started, we need to know which project will use the buildings and how many people will work on site. Our specialists then plan the site management office, field offices, dormitories, dining halls and any other facilities required. We share the plan with the project managers, refine the details and begin manufacturing.

At Karmod’s facilities, manufacturing takes place on fully integrated production lines equipped with modern machinery. The production system is linked to the project interface, which shortens manufacturing time. The prefabricated components are then loaded with all the required materials and transported to the project site.

Our installation crews arrive and start assembling the facilities on the day delivery is completed. A smooth manufacturing process and experienced crews allow us to finish on-site assembly quickly.

We coordinate planning, manufacturing, transport and assembly to deliver ergonomically designed buildings. Effective climate control and ergonomic design provide comfort for crews working in demanding conditions. These qualities make Karmod a preferred supplier of site buildings for major projects.

What We Built for the Road Project

We built 579 m² of prefabricated facilities for the Finike–Elmalı road project. The 172 m² office building will serve as the main site office throughout the project. The other buildings are a 254 m² dining hall and a 153 m² staff recreation building. On-site installation was completed in 20 days. The project required no dormitory because staff will be housed off site.

About the Elmalı–Finike Road Project

The new road in Antalya will connect the two districts via the Lake Avlan area and significantly improve traffic flow. The project includes a wildlife tunnel that will allow animals to cross the route safely. The crossing is designed to protect local wildlife by keeping animals away from vehicle traffic. The project will make travel easier and help preserve the area’s natural environment over the long term.

Our Projects

This is our job

From one end of the world to the other, we enable our customers to reach the ready-made construction sector produced with the new technology of the world. We guarantee reliability through technology and innovation, flexible commercial models and smart supply chain solutions that add value for you, following the project production network.