Prefabricated Mining Camp with 11 Blocks in Niger

Purpose Of Use Workers' Camp
Building Model Prefabricated Panel System
Number Of Buildings Block 11
Total Area 3.556 m²
Project Year 2026
Region To Be Used Agadez / Niger
Completion Time 67 Days
Currently 52 guests are viewing this project

We Built a Prefabricated Mobilization Camp at the Amzigar Gold Mine

At Karmod, we continue to carry out projects at some of the world's leading mining sites.

With our latest project in this field, we completed the installation and delivery of a prefabricated workers' camp at a gold mine in Niger, a West African country.

We have completed another exemplary mining camp project consisting of 11 blocks with a total area of 3,556 m². The project included the construction of specialized buildings, ranging from administrative facilities and site offices to various types of worker accommodation. With all 11 buildings completed, the project provides a comprehensive example of the facilities required at a mining site.

Karmod Expertise from Project Planning to Installation

With its focus on structural safety, advanced production technology, rapid installation, ergonomic design, and comfort, Karmod offers distinctive solutions for mining camp facilities. We carefully incorporated these advantages into every stage of the buildings prepared for the Amzigar gold mine.

During the initial proposal stage, we developed a comprehensive plan based on information obtained from the mine management, determining which buildings would be included in the project. At this stage, we evaluated the building systems, number of structures, and required dimensions. A detailed proposal reflecting the operational requirements of the mining site was then submitted to the customer for evaluation.

Following the approval of the project plan, the procurement process began, and the buildings were manufactured in a short time at Karmod's advanced production facilities. The prefabricated building components were professionally loaded into shipping containers and transported by sea to Nigeria. From the Port of Lagos, the structures were transported to the project site in Niger.

Karmod's professional installation team was dispatched to the region, where they unpacked the building components and began assembly. The installation of all 11 buildings was completed in just over two months, and the facilities were handed over for use at the Amzigar gold mine.

Following the completion of the mining camp near Agadez, Niger, ore extraction operations commenced at the mining site.

The 11-block prefabricated mining camp includes the following buildings:

  • 515 m² Prefabricated Mining Administration Building

  • 580 m² Prefabricated Dining Hall

  • 605 m² Foremen's Dormitory

  • 434 m² Workers' Dormitory

  • 460 m² Mining Analysis Laboratory

  • 213 m² Mining Site Medical Facility

  • 200 m² Site Security Building

  • 207 m² Core Storage and Warehouse Building

  • 170 m² Prayer Room

  • 2 Social Facility Buildings, each measuring 86 m²

Agadez (Amzigar) Mining Site

The Amzigar gold mine is located near Agadez, one of Niger's major cities. Mining activities around Agadez are contributing to the region's development as an important center for gold mining.

As part of the operations at the Amzigar mining site, 600 samples were analyzed in the laboratory. Following these analyses, ore extraction activities began in the region.

Our Projects

This is our job

From one end of the world to the other, we enable our customers to reach the ready-made construction sector produced with the new technology of the world. We guarantee reliability through technology and innovation, flexible commercial models and smart supply chain solutions that add value for you, following the project production network.