| Purpose Of Use | Oil and Natural Gas Pipeline Construction Site Structures |
| Building Model | Prefabricated Building |
| Number Of Buildings | 20 Blocks |
| Total Area | 5.369 m² |
| Project Year | 2026 |
| Region To Be Used | Turkey |
| Completion Time | 60 Days |
We continue our site structure mobilization installations in challenging areas with projects implemented at BOTAŞ energy sites in four different provinces of Turkey.
We have completed the installation of our prefabricated construction site mobilization structures, consisting of a total of 20 blocks, for BOTAŞ's oil and natural gas pipeline operations in the provinces of Adana, Erzurum, Kahramanmaraş, and Sivas.
We guide projects with our Karmod expertise. We reflected our organizational strength in the field in favor of our customer in this project as well. By fully ensuring the integration of production and the field, we accelerated the completion of the project in a short time.
The structures, produced in our modern facilities, were shipped simultaneously by our teams to 4 different provinces. Our field teams, prepared simultaneously for the same project, began installation work in 4 different provinces.
We completed the production and installation of 20 prefabricated construction site structures with a total area of 5,369 m² within 60 days and delivered them.
Within the scope of the project, our teams demonstrated another successful example of rapid installation without compromising on work safety in challenging field conditions. Our highly ergonomic construction site mobilization structures offer high comfort to those working in their offices and staying in their dormitories.
Thanks to our special insulation applications, comfort remains the only constant in our structures, regardless of changing climatic conditions in different regions.
Our prefabricated building model was chosen for the project. The buildings were installed at BOTAŞ's work sites in the provinces of Adana, Erzurum, Kahramanmaraş, and Sivas.
Our construction site mobilization group included office, dormitory, dining hall, changing room, and social facility buildings. A total of 20 separate prefabricated blocks were installed, with 5 blocks in each city.
K-CNS-MN10072370 / BN: 00009093
From one end of the world to the other, we enable our customers to reach the ready-made construction sector produced with the new technology of the world. We guarantee reliability through technology and innovation, flexible commercial models and smart supply chain solutions that add value for you, following the project production network.