Purpose Of Use | Worker Campus Construction Site Buildings |
Building Model | Prefabricated Structure and Demounted Sandwich Panel Combined Container |
Number Of Buildings | 126 |
Total Area | 3.870 m² |
Project Year | 2012 |
Region To Be Used | Baku, Azerbaijan |
Karmod Prefabricated that adds a new one to its prestige projects every day carried out one more important project at abroad. Karmod Prefabricated took part with its construction site mobilization building solutions at the Shah Deniz project planned for the transportation of Azeri gas to Europe. Natural gas will be transported to Europe from Turkey in the project carried out in partnership with the world famous oil giant BP and AZFEN.
Shah Deniz-2 Project that has the feature of being the starting point of Southern Gas Corridor reunites the caspian sea resources with Europe gas markets by way of TANAP (Trans Anatolian Natural Gas Pipeline) passing through Turkey.
Prefabricated and container construction buildings we prepared for Shah Deniz project that has the world's highest natural gas reserves detected near Baku so far, will service for years with their permanent usage. Shah Deniz 2 BP – AZFEN construction site worker camp mobilization will be used by staff who will take in charge during the project. Within the scope of the project, the construction site building with a closed area of a 2142 square meters was produced and sent to the field for installation.
There are all buildings that can be needed in a construction site at Karmod mobilization group such as prefabricated office buildings, container health facility building, dormitory and dining hall buildings, education areas and lounges, storage yard, place of worship, laundry, laboratory, security office building, wc and shower units.
Demounted sandwich panel system container building and panel system prefab building models were used and prepared together for the project. The dormitory buildings were built from completely container units and the same structure group was used for the offices. The dining hall building installed in H plan, was designed in a way that more than 1000 personnels can eat at the same time.
The first natural gas trasportation from Shah Deniz-2 project to Turkey started On 30 June 2018. The importance of Shah Deniz-2 Natural Gas Area is that it is the first sea bottom field development project In the Caspian Sea and in Azerbaijan. Also, the project has been on the books as the largest submarine infrastructure investment of BP worldwide.
From one end of the world to the other, we enable our customers to reach the ready-made construction sector produced with the new technology of the world. We guarantee reliability through technology and innovation, flexible commercial models and smart supply chain solutions that add value for you, following the project production network.
Discover