| Purpose Of Use | Construction Structures |
| Building Model | Container |
| Number Of Buildings | 8 Block |
| Total Area | 2.430 m² |
| Project Year | 2026 |
| Region To Be Used | Benghazi / Libya |
| Completion Time | 20 Days |
We continue to undertake construction site mobilization projects for new initiatives in Libya. Using our next-generation container structures, we have established container-based construction site facilities for a major project encompassing Libya’s prestigious hotels and the Benghazi Towers.
Our construction worker camp, consisting of 8 blocks with a total area of 2,430 m², houses all the structural components required for the project. The installation of our structures, which will accommodate 360 personnel and provide office spaces, was completed in just 20 days.
Karmod’s new-generation container building model undoubtedly played the most significant role in this rapid installation. Karmod’s new-generation containers are manufactured in modern facilities using state-of-the-art machinery, featuring a weld-free production model. Karmod’s new-generation modular production model stands out for its advantages in easy transportation and rapid installation. Thanks to the convenience provided by the fully bolted and interlocking system, our teams completed the installation of the 8-unit container mobilization in just 20 days, making the project operational.
The container construction site mobilization we established at the project site in Benghazi includes structures required for everyone from engineers to blue-collar workers. Management and technical office buildings, dormitory and dining hall buildings, a clinic building, and a laundry facility are among the structures installed for the project.
Container Dining Hall; Designed as a single-story modular container unit with a floor area of 545 m², it was installed at the project site.
Container Blue-Collar Worker Dormitory; Designed as a single-story structure with a floor area of 406 m², it was installed on-site.
Engineer Dormitory Building; Designed at 406 m², it was constructed specifically for the use of site engineers.
Container Project Office; Designed as a two-story modular container unit with a total area of 797 m², it was installed on-site.
Container Project Management Office; Designed as a single-story structure with an area of 69 m².
Site Manager’s Office; Designed using a new-generation container model with an area of 69 m² and installed on-site.
Container Health Building; Designed specifically as a 55 m² clinic building to meet the needs of the construction site, it was installed.
Container Laundry Building; The 83 m² container laundry building was installed with plumbing and electrical systems designed to ensure the optimal ergonomic placement of washing machines.
K-CNS- MN10002875 / BN: 00000080
From one end of the world to the other, we enable our customers to reach the ready-made construction sector produced with the new technology of the world. We guarantee reliability through technology and innovation, flexible commercial models and smart supply chain solutions that add value for you, following the project production network.