| Purpose Of Use | Office |
| Building Model | Container |
| Number Of Buildings | 32 Pieces |
| Total Area | 515 m² |
| Project Year | 2026 |
| Region To Be Used | Sinop / Turkey |
| Completion Time | 10 Days |
The 2026 project to meet the office needs of the Ceka Enerji (Eti Bakır) mining site comprises an interconnected container building with a total area of 515 m² in Sinop. Bringing together 32 containers, the project aims to create an office space where on-site teams can carry out their daily work and manage administrative processes. The interconnected building configuration allows workspaces to be brought together under one roof and the interior layout to be arranged according to operational needs.
For customers considering container offices at mining sites, suitability for local weather conditions, indoor comfort and the installation process are important considerations. Given Sinop’s rainy and humid climate, insulation, water drainage, heating and ventilation solutions need to be assessed together. The layout of office areas and technical equipment are determined according to usage requirements, while the total cost and delivery timeframe are established based on the selected materials, site access, ground preparation and the scope of transportation and assembly.
From one end of the world to the other, we enable our customers to reach the ready-made construction sector produced with the new technology of the world. We guarantee reliability through technology and innovation, flexible commercial models and smart supply chain solutions that add value for you, following the project production network.
Discover