Purpose Of Use | Camp structures ( Dormitory, Dinning Hall, Office, Wc/Shower) |
Building Model | Demounted Container |
Number Of Buildings | 50 units |
Total Area | 720 m² |
Project Year | 2009 |
Region To Be Used | Trablus, Libya |
Completion Time | 1 mounth |
The prominent feature of the project is that the container construction sites to be used in oil exploration fields across Libya are shipped ready for use from the factory. Our container structures, which are normally preferred to be disassembled and installed in the field, were requested as ready for use in this study. In this direction, the structures designed as 140 ready-made units were produced in 3x9 meters, ie 27 m2, and were shipped to the important port of the country, Tripoli Port, by sea container transportation. From here, the construction site buildings, which were transferred to the storage area of the company located in the capital Tripoli, were transferred to the areas to be used again within the scope of the planning.
From one end of the world to the other, we enable our customers to reach the ready-made construction sector produced with the new technology of the world. We guarantee reliability through technology and innovation, flexible commercial models and smart supply chain solutions that add value for you, following the project production network.
Discover