Purpose Of Use | Housing |
Building Model | Steel Frame |
Number Of Buildings | 4+1 Housing |
Total Area | 224 m² |
Project Year | 2024 |
Region To Be Used | Lisbon / Portugal |
Completion Time | 29 Days |
As Karmod, our housing projects we realized throughout Europe continue without slowing down. We completed one of our projects in steel house model in Lisbon, the capital of Portugal. Our steel house in villa housing style was designed in 4+1 apartment type. The size of the single-storey house is 224 m2.
Production technologies in the steel structure model are quite advanced in Turkey. High security steel structures can be produced in one-to-one details with the project on new technology machines. Moreover, this production time is quite fast. Technological machines specially developed for steel structure processing are the biggest factor in production speed. So much so that steel production is up to 70 percent faster than other building models.
Technological investments in steel structure production in Turkey contribute to the concentration of demand from European building needs in the country. Along with production, Turkey's tight highway connections with European countries make the country attractive again in demand. Steel structures, which are produced with a modular system, can be loaded onto truck-like vehicles and transferred to the project site in Europe within days or even hours. Ease of shipment accelerates steel house projects as if they were transferred from city to city within the country. Karmod professional team is ready at the project site the day the shipment is completed. The installation, which starts without wasting time, is completed within days and the steel house is made ready for residence.
The speed in the field installation of steel houses is the prominent advantage of the production model. In houses built in other building models, production is carried out intensively on site. In the steel house model, since the production is carried out on technological machine lines, there is no work left on the field in the name of production. With the advantage of bolt-nut and plug-in system, steel house field installation processes are incredibly accelerated.
Houses built with the steel structure model harmonize very well with insulation materials. Insulation applications made with a quality control system within the project increase the steel house air conditioning performance at an excellent level. Air conditioning in the house can be realized with minimum energy expenditure regardless of summer or winter. Savings in energy expenditures in the steel house model saves budgets for many years when the house will be used.
The steel villa housing project we realized in Lisbon, the capital of Portugal, has a size of 224 m2. The installation of the single-storey 4+1 house type steel house was completed in 29 days. Karmod steel house provides comfort with its building aesthetics, safe model, good insulation values and ergonomics of use.
From one end of the world to the other, we enable our customers to reach the ready-made construction sector produced with the new technology of the world. We guarantee reliability through technology and innovation, flexible commercial models and smart supply chain solutions that add value for you, following the project production network.
Discover