You can reach us from our sales offices and call center for all your requests.

Modular Facilities 972 m²

  • Total Area 972 m²
Currently 21 guests are viewing this product
Call us

Customized Prefabricated Guesthouse and Dining Hall Solutions for the Tourism Industry

One of the most critical needs for hotels operating in the tourism sector is the provision of buildings to accommodate seasonal staff and meet their dining requirements.

With Karmod's prefabricated construction expertise, we have built modern dormitory and dining hall buildings for a 5-star hotel located in Antalya Manavgat, offering fast, comfortable, and economical solutions to meet this need.

Fast and Economical Accommodation Solutions with Prefabricated Structures

Hotels operating in tourist areas primarily hire seasonal staff, making accommodation a top priority for employees.

High rental costs and difficulties in finding housing have led hotel management to consider building their own staff dormitories.

At this point, prefabricated and container structures offer an ideal solution with their quick installation and cost advantages.

The project we implemented in Manavgat was carried out with this approach and has become a successful model.

Project Details: Dormitory and Dining Hall Buildings

Prefabricated Dormitory Building

  1. Total area: 191 m²
  2. Number of floors: Single-story
  3. Number of rooms: 8 independent rooms
  4. Each room: Accommodation capacity for 5 people
  5. Total capacity: 40 people
  6. Room amenities: Shower cabin and WC unit
  7. Entrance area: Spacious and airy lobby area

Thanks to the custom-designed rooms, staff can stay comfortably and conveniently.

Prefabricated Dining Hall and Kitchen Building

  1. Total area: 781 m²
  2. Number of floors: Two-story
  3. Ground floor: 419 m² (Dining hall for hotel guests)
  4. Upper floor: 362 m² (Staff dining room and relaxation areas)

This building is designed to provide separate dining areas for both hotel guests and staff.

The upper floor also includes special areas for staff relaxation.

Project Delivery Time and Contribution to the Sector

The construction and delivery of the two buildings were completed in just 33 days.

This rapid production and construction process provides a permanent and practical solution to the staff accommodation issues faced in the tourism sector.

Karmod Prefabricated continues to be preferred in prestigious hotel projects in the Antalya region and contributes to the sector with high-quality solutions.

Most Viewed