You can reach us from our sales offices and call center for all your requests.

Modular Accommodation 350 m²

  • Total Area 350 m²
Currently 91 guests are viewing this product
Call us

The 1,346 m² prefabricated and container building system, constructed with Karmod Prefabricated expertise, provided a modern construction site for workers involved in the Northern Marmara Highway and Sabiha Gökçen Airport New Runway Construction projects.

Located in the Akfırat region of Istanbul Pendik, next to the F1 Track, this facility served two major projects simultaneously.

Quick Installation and Safe Use: Completed in 37 Days

This construction site facility, which combines prefabricated and container building systems, was completed and put into use in just 37 days.

The structures were designed in accordance with workplace safety and comfort standards.

Project Details: Structural Features

General Structural Information

  1. Structural Model: Sandwich Panel Prefabricated Structure and New Generation Container
  2. Number of Structures: 5 Blocks
  3. Total Area: 1,346 m²
  4. Project Year: 2018
  5. Location: Akfırat, Pendik, Istanbul, Turkey
  6. Completion Time: 37 days

Constructed Structures and Usage Areas

1. Two-Story Prefabricated Construction Site Office

  • Total Area: 272 m²
  • Floor Plan:
    • Ground Floor: 3 offices, prayer room, tea room, men's/women's restrooms
    • Upper Floor: 37 and 32 m² workrooms, 40 m² meeting room, restroom
  • Purpose: Project management and field operations control center

2. Prefabricated Dining Hall Building

  • Total Area: 171 m²
  • Sections:
    • Dining hall (60-person capacity)
    • Food preparation area
    • Pantry and storage section
  • Features: Capacity can be increased with time-based planning

3. Container Dormitory Buildings

  • Total Area: 672 m² (Blue Collar) + 117 m² (Administrative)
  • Blue Collar Dormitory: 24 dormitory rooms (total capacity of 196 people)
  • Administrative Dormitory: 16-person capacity, private rooms
  • Hygiene and Comfort: Shower and toilet units, climate control systems

4. Prefabricated Local Building (Social Facility)

  • Total Area: 114 m²
  • Capacity: 36 people
  • Content: Prayer room and ablution areas

Project Summary: A Single Solution for Two Major Construction Projects

Northern Marmara Highway Project

  • A strategic highway project connecting Europe to Asia via Istanbul
  • Covers the section extending from the Asian side of Istanbul to Sakarya
  • The construction site was designed to meet the accommodation and rest needs of teams working on the highway construction

Sabiha Gökçen Airport New Runway Construction

  • A project to add a new runway to Istanbul's busiest airport
  • Modern accommodation and social areas were provided for engineers and technical staff working on the project site

Advantages of Prefabricated and Container Building Systems

1. Quick Installation and Flexible Use

  • A 1,346 m² area was completed in just 37 days.
  • The modular system of prefabricated and container structures enables quick assembly.
  • Structures can be easily expanded according to capacity requirements.

2. High Structural Safety

  • The sandwich panel prefabricated structure system provides high insulation and durability.
  • Karmod's new-generation container models offer dormitory solutions compliant with international workplace safety standards.
  • Long-lasting use with a steel-reinforced structural system.

3. Ergonomic and Comfortable Living Spaces

  • Dormitories, restrooms, and shower areas provide maximum comfort.
  • Social facilities and relaxation areas enhance employee motivation.
  • The dining hall features a spacious and airy dining room and a hygienic food preparation area.
Most Viewed