You can reach us from our sales offices and call center for all your requests.

Construction Site Container 77 Block

  • Total Area 50.000 m²
Currently 45 guests are viewing this product
Call us

Construction Site Container – 77-Block Large-Scale Project

The 77-block construction site container project, designed to meet the needs of modern construction sites, was developed with the goals of high comfort, quick installation, and maximum efficiency. With its large capacity, this project meets the accommodation, office, and social space needs of large construction companies under a single system.

A Smart Solution for Large Construction Sites

This massive 77-block project is designed to cover all construction site needs, including a cafeteria, dormitory, office, changing room, storage, and recreation areas.

Each container block can be quickly assembled on site thanks to the modular construction system, minimizing time loss.

The system used throughout the project includes:

  1. Steel construction support system,
  2. Heat and sound insulated panels,
  3. Fire-resistant coating materials,
  4. Modern electrical and sanitary infrastructure.

Functional Area Distribution and Planning Advantage

A total of 77 container blocks were designed on the project site to suit different functions:

  1. 24 blocks for staff dormitory area
  2. 12 blocks for dining hall and social facilities area
  3. 8 blocks for offices and administrative units
  4. 10 blocks for shower – WC and changing area
  5. 7 blocks for storage and technical equipment room
  6. 16 blocks for support and temporary use areas

This planning both enhanced the living comfort of project staff and streamlined on-site workflow.

Technical Specifications and Production Details

  1. Total Area: Approximately 7,500 m²
  2. Type of Use: Construction site camp area
  3. Number of Floors: Mixed single and two-story blocks
  4. Installation Time: 45 days
  5. Supporting System: Galvanized steel construction
  6. Cladding: Sandwich panel exterior, PVC interior cladding
  7. Floor: PVC-coated plywood
  8. Insulation: 50 mm wall insulation, 80 mm roof insulation
  9. Plumbing: Integrated modular electrical and sanitary systems

Each container unit was prefabricated at the factory, and full installation was completed on-site with only assembly work. This significantly shortened the project delivery time.

A System that Saves Time, Space, and Money

The 77-block construction site container system can be installed 60% faster than traditional reinforced concrete construction site buildings and offers up to 40% cost savings.

Thanks to its modular design, the blocks can be dismantled after the project is completed and reused in other projects. This feature makes it both an economical and sustainable solution.

Comfortable Living and Working Spaces

Designed with the comfort of project workers in mind, the containers feature:

  1. High insulation,
  2. Natural ventilation,
  3. Ergonomic furniture compatibility,
  4. Lighting and climate control systems.

This ensures maximum comfort during long-term stays, even in challenging construction site conditions.

Installation and Logistics Process

All production was carried out using a disassembled system and transported to the project site by road. The modules were placed on the pre-prepared ground at the site, and electrical and plumbing connections were completed, making them ready for occupancy within 45 days.

Get a Quote – Let's Plan Your Project Together

Our 77-block construction site container solution is an ideal option for large-scale needs in construction, energy, mining, road, and infrastructure projects.

Contact us immediately for customized planning, fast delivery, and an economical quote for your project.

Most Viewed